gdańskie melioracje

Trenchless renovation of the rainwater drainage system consisting in extending the existing DN 230-240 installation to DN 280 running under the tracks. The installation is made of Modular Pipes, with a total length of 16.5 meters. 6 meter long trenchless installation of DN 315 pipe between wells DN 1200 and DN 1000.